Here is the basement after it has been cleared most of the way. It was a lot of work, but with these boys of mine we just kind of charge in there like machines and go, go, go until we accomplish an objective for the day. We got this all done in about 2 1/2 days time including getting the dreadful, full of food, fridge out. A few days later we came out and worked on clearing the garage. We also removed all water pipes and wiring from the basement. Next we will be vacuuming every speck and spraying down with bleach and power washing then painting with some special basement sealer paint.
Labels
basement
(22)
basement bath
(3)
before and after
(11)
clean up
(20)
demolition
(17)
everyday things
(6)
fireplace
(8)
for fun
(1)
framing
(3)
garage
(3)
insulation
(1)
junk
(25)
main level
(29)
major fix it job
(2)
misc.
(7)
new stairs
(2)
old back porch
(1)
old bathroom
(1)
old bedroom
(3)
old kitchen
(4)
old office
(1)
other projects
(10)
OUR STORY OF THE BEGINNING
(1)
outbuildings
(10)
outside
(66)
play
(4)
plumbing
(1)
providence
(6)
reconstrution
(4)
scenery
(7)
sheetrocking
(2)
special times
(6)
that old closet
(1)
the cupboard
(4)
the other cupboard
(1)
trash
(16)
treasure from the trash
(3)
upstairs
(11)
windows
(1)
Blog Archive
Friday, May 9, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment